Power frequency withstand voltage test devices are widely used in electrical manufacturing departments, power operation departments,
Searching for the best Combined Substation manufacturers in China? Demiks/Combined Substation is the best in the industry. Trust Demiks/Combined Substation to provide you with durable structures that exceed expectations and perform optimally. We look forward to helping you power your business and strategically build your infrastructure.
Space-efficient Construction: Minimal dimensions, low weight, and straightforward fitting.
Spherical Fuel Tank: Guarantees no leakage and reduces the heating of parts, losing heat.
Broad Usage: Covers metropolitan, industrial, and remote locations.
Geophysical Restrictions: Elevation ≤1000m; heat -35℃~+40℃.
Moisture Resistance: Daily ≤95% and within the month ≤90%.
Safe Installation: Requires non-hazardous, ventilated, and stable locations.
| Project | Unit | Parameter |
|---|---|---|
| Rated voltage | kV | 10/0.4(High pressure/low pressure) |
| Maximum working voltage | kV | 12(High pressure side) |
| Rated frequency | Hz | 50 |
| Rated Capacity | kVA | 50-1600 |
| 1 minute power frequency withstand voltage | kV | 35 |
| Lightning impulse voltage | kV | 75 |
| cooling method | Oil immersed from cold | |
| High voltage backup fuse breaking current | kA | 50 |
| Plug-in fuse breaking current | kA | 2.5 |
| Ambient temperature | ℃ | -35~+40 |
| Coil allows temperature rise | ℃ | 65 |
| Unloaded voltage regulation | ±5%or±2×2.5% | |
| Noise level | db | 50 |
| Protection level | IP43 |
Each electrical component of the power airplane, similar to a substation, serves an important function. An electrical substation is an important aspect of power systems, such as cyber units. This powerful airplane is location-bound and is needed in various industrial locations.

Power frequency withstand voltage test devices are widely used in electrical manufacturing departments, power operation departments,

The intelligent upgrading of global power grids, the expansion of new energy grid integration, and the

The induced over-voltage withstand test is performed to verify the longitudinal insulation of a transformer. The